372 Mt. Olive Road, South
Salem, Ohio 45681
E-mail: dhs1844@hotmail.:
937-403-2707
Professional
Summary
Provide
leadership and management oversight in planning maintenance and preventive
maintenance activities that have resulted in improved and more efficient
plant operations. Possess thirty five years’ experience in design,
maintenance and repair of electrical/electronic and mechanical devices.
Experience planning, assembling work packages, and material procurement to
perform a wide variety of mechanical and electrical maintenance.
Education and experience has provided an emphasis on teamwork and high
job performance. Instructed blueprint reading and basic electricity at Southern
State Community College. Proficient in the use of Primavera P3/6, Windows ,
Synergen Series CMMS ver 2.1, Oracle, Microsoft Office, Excel, Word.
Possessed an “L” security level clearance. OSHA 30 Certified
Professional Experience
RockTenn – Early Construction
Scheduler/Planner 13 Jan 2015 – 2 June 2015
Responsibilities included the building/analyzing of
the schedule using P6.The running/building reports for oversight of the
project, the installation of an entire boiler. We started with a bid schedule
of 341 activities and by the 2nd of June we were at 850 activities.
Cuyuga Power Plant – Duke Energy
Scheduler/Planner 3 Sep 2014 – 15 Sep 2014
Responsibilities include the building/analyzing of
multiple schedules using P6.7 SP1, running/building reports for oversight of
the project, with an outage for the installation of a Dry Fly Ash system.
Petersburg Power plant (IPL) – Kiewit
Scheduler/Planner 24 Feb 2014 – June 2014
Responsibilities include the building/analyzing of
multiple schedules using P6.7 SP1, running/building reports for oversight of
the project, with about 8000 activities each
Westport One – Sachs Electric
Scheduler/Planner 20 May 2013 – 25 Oct 2013
Responsibilities included the building/consulting
and analyzing multiple schedules using P6 Revision 8.2, running/building
reports for oversight of the project, with about 1800 activities each.
Tek Systems – State Farm
Scheduler/Planner 4 Mar 2013 – 3 May 2013
Responsibilities included the building and
maintaining various schedules using P6, running/building reports for
oversight of several projects.
Proenergy – Kansas City Power and Light
Scheduler/Planner/Consultant
3 Dec 2012 – 9 Jan 2013
Responsibilities included the import/export of
various schedules, and building of reports for oversight of several projects
on the plant sight.
Proenergy – Woodard & Curran
Scheduler/Planner/Consultant
14 Sep. 2012 – 20 Oct 2012
Responsibilities include the assisting in building
and maintenance of a schedule using P6 for a power plant Bi-annual
Maintenance Outage for one of their clients.
Proenergy – CLECO
Scheduler/Planner/Consultant
24 Sep. 2012 – 10 Oct. 2012
Responsibilities include the assisting in building
and maintenance of a schedule using P6 for a Natural Gas power plant Outage.
Resume
of David H. Sweeney – Page 2
Proenergy - Curacao
Scheduler
9 June 2012 – 25 June 2012
Responsibilities include the building and
maintenance of a schedule using Microsoft Project 2007 at the Refinery on the
island of Curacao. This was for various Coal fire plants on the site.
Proenergy - Nooter Construction -
Scheduler/planner
5 March 2012 – 15 May 2012
Responsibilities include the execution and
maintenance of a schedule using Primavera 6 at the Labadie Coal Fire Power
Plant. This was for an integrated schedule on an Outage for Unit 2, primary
having to do with SOFA work.
Woodbridge - Day-Zimmerman
Scheduler/Planner 22 Aug 2011 – 18 Nov 2011
Responsibilities include the execution and
maintenance of a schedule using Primavera 6 at the Port Washington Generating
Station (Natural Gas). There were two maintenance outages (including Turbine
rebuilds) at this gas fired plant for each of the two blocks in the fall of
2011.
Woodbridge - Day-Zimmerman
Scheduler/Planner9 May 2011
– 19 Aug 2011
Responsibilities include the development and
execution of a schedule using Primavera 6 at the Presque Isle Power Plant
site (Coal Fire) for a coal reject system in the summer of 2011. This was for
a flex fuel project, (eastern coal to western coal).
Starcon
Scheduler/PlannerNovember
2010 – January 2011
Responsibilities include the development and
execution of a schedule using Primavera 6 at the Bayer Crop Science site for
a turnaround in the month of January. This was for a chemical production
facility.
Babcock & Wilcox Construction Company
Inc.
October 2005 – May 2010
Scheduler
Responsibilities include the development and
execution of various project plans for many different proposals, SCR’s, FGD’s
and different outages using Primavera 3.2, 5 or 6.2. (these was all Coal Fire
Plants)
Locations Worked: Shipping Port, PA – HRH
Replacement Outage – March 2010 to May 2010
Barberton,
OH – Multiple Proposals (S/G and Main Condenser replacement)
– March
2009 to Jan 2010
Limestone,
TX – Outage – Jan 2009 to March 2009
AMOS,
Charleston WV – Multiple Outages - April 2008 to Jan 2009
AMOS,
Charleston WV – FGD – Jan 2007 to April 2008
MITCHELL,
New Martinsville WV – Multiple Outages – Oct 2005 to Jan 2007
MITCHELL,
New Martinsville WV – FGD – Oct 2005 to Jan 2007
Ken-Bar Tool & Engineering (Muncie, Indiana)September
7, 2004 – 30 September 2005
Machine Controls Engineer/Technician
Design, development and draw using AutoCAD 2000 the
electrical and pneumatic details for test fixtures used by a variety of
automotive plants to verify that their parts meet tolerances. Developed
material lists (BOM) as well as research and design new installations.
Develop Allen Bradley PLC Programming or ladder logic programming for
processors that are installed.
Sun Technical Services, Inc. – American
Electric Power (Clinch River) February 2, 2004 – May 19, 2004
Scheduler/Planner
Development/execution of a detailed project plan for
an outage at the Clinch River Power Plant. Performed weekly update through
interaction with project manager and superintendents. Developed weekly
performance reports, performed outage scheduling, scheduling support,
inspection scheduling, and critical path analysis.
Resume
of David H. Sweeney – Page 3
Babcock & Wilcox Construction Company Inc.
(Zimmer)April 22, 2002 – February 2, 2004
Scheduler
Responsibilities include development/execution of a
detailed project plan. Played a key role in development of a
consistent WBS
and cost coding system. Develop resource and cost loaded schedule for
installation of 1300 mw coal fired power plant SCR. Created and
maintained B & W document controls system and maintained B & W SCR
engineering drawing library.
United States Enrichment
Corporation (USEC)1996 – 2002
FLM (Front Line Manager)/Planner
(Formerly
Lockheed Martin Utility Services, Inc.) A global energy company with
customers in 14 countries, 4,500 employees, headquartered in Bethesda,
Maryland.
Develop work packages for the
various work requests throughout the plant, as well as supervise
approximately 25 electricians.
§ Supervise
hourly personnel and train employees on Company policies.
§ Maintain
well-defined safety, security and health programs.
§ Establish
and maintain effective communications and solicit input and involvement in
the work place.
Senior Maintenance Planning Specialist-USEC
(Achieved this position in less
time than predecessors.) Develop
work packages for a wide range of electrical, instrument and some mechanical
needs. The development includes walking jobs down, establishing permits,
procuring needed parts, researching drawings, and collaborating with various
engineers. Closely adhering to NRC requirements, build quality work packages
that allow tasks to be performed without compromising any safeguards.
§ Maintained minimal backlog of work orders within database by
checking and verifying status of work activity. Developed work packages in a
timely manner for priority work.
§ Negotiated with outside vendors to acquire best price for
materials. Procured only top quality equipment.
§ Served as liaison between building custodians, engineers, and
foremen and crafts people.
§ Achieved downtime reduction by coordinating manpower, material
and other relevant resources.
§ Researched obsolete equipment and procure suitable replacement if
necessary
§ Develop work orders
Johnson Controls Automotive
Inc. 1984 – 1996
Maintenance Electrician
Maintained, fabricated and repaired
electronic, electrical, hydraulic and pneumatic systems in an automotive
seating manufacturing plant that was working toward ISO 9000 and being
strictly a “Just In Time” operation. Experienced with PLC’s and SLC’s
manufactured by Allen Bradley and a variety of electrical controls. Worked on
PLC’s for many years and have developed expertise in their repair and
maintenance.
§ Assisted startup team in bringing several foam production lines
into service.
§
Designed and installed data highway system for PLC’s
plant-wide.
§
Participated on PLC upgrade team member on several
production lines.
§
Previously worked at Nashua Homes and Telmark Security.
§ Resume of
David H. Sweeney – Page 4
Military
Service
United States Navy
1975 - 1981
Interior Communications Second Class Petty Officer –
Honorable Discharge
§
Supervised and managed the Interior Communications
personnel on board the U.S.S. Mississippi (CGN-40).
§
Awarded the Good Conduct Award and the Navy Achievement
Award.
§
Trained in the operation of the ships service electrical
system for a ship with a nuclear reactor, both 400Hz and 60 Hz, and was also
responsible for the maintenance of the alarm system for the missile
magazines.
Naval Technical
Schools
Basic Electricity and Electronics, San
Diego, California
Interior Communications A School, San
Diego, California
Nuclear Power School, Orlando, Florida
Nuclear Power Training Unit, Ballston
Spa, New York
Damage Control School, Norfolk, Virginia
Fire Fighting School, Norfolk, Virginia
Alarm Warning and Indicating, Norfolk,
Virginia
Education
Southern
State Community College
Studied
Electronics/Computers
Industrial
and Professional Schools, Classes and/Seminars
Primavera P6 Professional advanced Rel
8.2, Houston, Texas
Primavera P6e/c Training,
Chicago, Illinois
Primavera P3 Training, Indianapolis,
Indiana
Clark Solid State Lift Trucks,
Cincinnati, Ohio
Allen Bradley SLC seminar, Chillicothe,
Ohio
Contraves Industrial Drives, Pittsburgh,
Pennsylvania
Allen Bradley PLC5 School, Indianapolis,
Indiana
Nachi Robotic School, Detroit, Michigan
Speery Vickers Hydraulic School,
Greenfield, Ohio
Rexroth Hydraulic Pump Rebuild Seminar,
Greenfield, Ohio
References are
available upon request.